Design of Foul Water Adoptable Pumping Stations

January 14, 2026

The adoption of a pumping station and its associated rising main by a water statutory undertaker under a Section 104 of the Water Industry Act 1991, is an option developers may pursue to secure the long-term serviceability and maintenance of the asset.  This approach benefits future residents of the development by avoiding the complexities and liabilities associated with private maintenance schemes.

The design of an adoptable pumping station should be in accordance with ‘Sewerage Sector Guidance – Approved Documents’ and the ‘Local Practices’ published by each statutory water undertaker.

Before a S104 submission is formally made, there are several considerations that developers and designers should consider to ensure that the proposals are adequate, and the technical approval process is streamlined:

 

Location of the pumping station and associated pipework

Determining the most suitable location for the pumping station is one of the first and most important steps in the design process.

Key considerations include:

  • Odour, noise and nuisance: The pumping station should be located an appropriate distance from any habitable buildings to minimise the risk – typically 5 – 15 meters (depending on the size and use of the pumping station).
  • Accessibility: The enclosure should be easily accessible from a public road, and typically not further than 60m from the public highway.
  • Flood risk: The site should not be at risk of flooding from any source.
  • Vehicle access: A detailed swept path and visibility analysis should be carried out to ensure the relevant maintenance vehicle can safely, access and navigate the site.
  • New highway access: If a new access road is to be provided, the works will be subject to S278 approval from the relevant Highways Authority.
  • Rising main location: The rising main should also be offered for adoption, and therefore consideration should be made to its location early on in the design process.

 

Hydraulic Design

Flow Calculations:

The performance of the pumping station and rising main is determined by the daily flow volume.

  • Residential developments: The standard volume is 4000 litres per dwelling per day.
  • Other domestic flows: These should be calculated in accordance with BS EN 12056-2 System II, which is based on the flow discharge rates from individual foul appliances.
  • For large developments: Large developments where single units have minimal influence on overall flow, calculations should be based on a measured rate of flow per head.

Code of Practice: Flows and Loads – 4, provides for the typical daily volume for different types of developments. Where detailed information is not available, a design flow of 0.6 litres per second, per hectare of developable land, may be adopted.

  • Trade effluent flows (wastewater from industrial processes): Flows should be based on metered discharge data from similar premises or assumed as:
  • 5 L/s/ha for normal industrial use,
  • 0 L/s/ha for wet industry, or
  • 7 L/s/ha where the proportion of wet industry is unknown.

Emergency Storage:

Emergency storage should be included to allow for pump failure or maintenance.

  • Adoptable standards require the following:
  • For developments of less than 500 dwellings, the storage should provide for a minimum of 160 litres per dwelling.
  • For 500 dwellings or more, the sewerage company should be consulted to determine the storage requirements.
  • For commercial or industrial developments:

Storage should provide for a minimum of one hour’s peak design flow rate.

 Rising Main:

  • The rising main should be designed to ensure self-cleansing velocities, and to avoid sediment settlement in low points, or air locking and pressure build-up at high points. This is achieved through the use of wash out chambers at low points and air valves at high points.
  • For rising mains longer than 500m, the following additional risks should be reviewed:
    • Retention time and the associated septicity risks
    • The impacts of hydraulic surge
    • The effects of cyclic loading on the fatigue life of the materials.

 

Structural and MEP design

  • The final hydraulic and electrical design of the pumping equipment should be developed by a qualified Mechanical and Electrical engineer.
  • The design of each of the components will require a formal design by a structural engineer, as well as a detailed Ground Investigation to inform the design.
  • Parts of a sewage pumping station can be hazardous zones. It should be discussed with the sewerage company at an early stage whether A DSEAR (Dangerous Substances and Explosive Atmospheres Regulations) assessment should be undertaken by a relevant specialist and a report compiled.

 

At Civilistix we have extensive experience in the submission and technical approval of S104 pumping station adoption packages for numerous statutory water undertakers across the UK.

Adoptable (S104) Drainage Design | Civilistix

News & Views

Latest Updates

Manhole Backdrops: The Pros and Cons

November 6, 2026

Manhole Backdrops: The Pros and Cons

Manhole backdrops can offer excavation savings and design flexibility, but introduce hydraulic and maintenance challenges. Their use requires careful consideration of site constraints, adoption requirements and long-term drainage system performance.

Why Drainage Easements Matter to Site Layout and Detailed Design

October 29, 2026

Why Drainage Easements Matter to Site Layout and Detailed Design

Drainage easements can influence building positions, drainage strategies and development costs. Identifying these constraints early helps project teams coordinate site layouts, maintain sewer access and avoid unnecessary redesign or diversions.

Designing Safe Pedestrian Routes Across Vehicle Accesses

October 23, 2026

Designing Safe Pedestrian Routes Across Vehicle Accesses

Safe pedestrian routes require careful coordination where they cross vehicle accesses. We explore how layout, visibility, vehicle speeds, accessibility and drainage help create safe pedestrian crossings.