Infiltration Rates and how they influence Soakaway Design

July 25, 2024

Soakaways are used to infiltrate surface water into the ground.

Typically, soakaways must be able to attenuate surface water with no flooding during the critical 1 in 100 years plus 40% climate change event and half drain within 24 hours to meet current best practice design guidance.

Soil consistency varies considerably across the UK. Therefore, the infiltration rate of the ground needs to be established at the site of the proposed soakaway to establish a suitable design infiltration rate.

The infiltration rate is influenced by soil type, soil structure and moisture content among other factors

In order to establish a suitable design infiltration rate, an infiltration test to BRE 365 should be conducted. Typical requirements of BRE 365 are as follows:

Infiltration Guidelines:

  • A trial pit should ideally be excavated at the location of the proposed soakaway. This needs to be at least 5m away from the existing or proposed building footprint.
  • A trial pit must be rectangular in shape and excavated in accordance with the following size dimensions – size: 1-3m length; 0.3-0.1m width and 1-2m depth.
  • Detailed logging of ground strata should be undertaken, including information such as topsoil, made ground, clay depth and ground water levels.
  • Photographic evidence should be documented at separate times during the procedure.

Infiltration Test Procedure:

Once the excavation pit has been dug, it should be quickly filled with water to 75% of its depth.

A record is then kept of the time taken for the water level to reach 25% of the pit depth.

This procedure should be repeated 3 times for each BRE 365 trial pit. The depth of the water should generally be recorded every 10 minutes or every 100mm that the water level drops.

Calculating Infiltration Rate:

As of BRE 365 infiltration methodology, soil infiltration rate can be determined as follows:

Where:

Vp75-25 : effective storage volume of water in the soakage trial pit between 75% and 25% effective storage depth.

∂s50 : internal surface area of the soakage trial pit up to 50% effective storage depth, including the base area.

tp75-25   the time for the water level to fall from 75% to 25% effective storage depth.

Design of Soakaway

As the infiltration test is repeated 3 times, 3 results for each trial pit are calculated.

The worst (smallest value) infiltration rate is used in the design of the proposed soakaway.

Generally, an infiltration rate of >1 x 10-6 m/s, is considered suitable for infiltration discharge to the ground, allowing for half drain down time within 24 hours.

An overview of general infiltration rates for each type of strata is provided below:

Typical values for the Infiltration Rate of Soils (Courtesy of CIRIA 753; The SUDS Manual)

Summary

An infiltration test to BRE 365 is pivotal in the design of effective soakaways.

Accurate site-specific testing and careful design ensure that soakaways effectively manage surface water, comply with regulations and mitigate the risk of flooding.

 

Civilistix Services:

Surveying Services | Civilistix

Infiltration & Percolation Testing | Civilistix

 

News & Views

Latest Updates

How Topographical Surveys Inform Drainage Design

November 12, 2026

How Topographical Surveys Inform Drainage Design

Topographical surveys help identify overland flow routes and low points where water may collect. Accurate survey information supports informed drainage design, flood risk assessment and site layout decisions from the outset.

Manhole Backdrops: The Pros and Cons

November 6, 2026

Manhole Backdrops: The Pros and Cons

Manhole backdrops can offer excavation savings and design flexibility, but introduce hydraulic and maintenance challenges. Their use requires careful consideration of site constraints, adoption requirements and long-term drainage system performance.

Why Drainage Easements Matter to Site Layout and Detailed Design

October 29, 2026

Why Drainage Easements Matter to Site Layout and Detailed Design

Drainage easements can influence building positions, drainage strategies and development costs. Identifying these constraints early helps project teams coordinate site layouts, maintain sewer access and avoid unnecessary redesign or diversions.