November 7, 2024
As we approach the end of a busy and rewarding year we reflect on the exciting and diverse range of projects that our team have tackled this year. From large scale developments to assisting clients when they embark on that much anticipated extension/renovation.
We are thrilled to share that Francisco has been promoted to Senior Engineer – a well deserved recognition of his hard work and dedication – well done Fran!!
On a personal note, Dan, our director, has welcomed a new member to his family, a gorgeous baby boy. We can’t wait to see if he will follow in his dad’s footsteps and become a skilled civil engineer one day. Congrats to Dan and his family on this wonderful new chapter!
Our engineers have enjoyed sharing their knowledge and expertise through insightful articles on LinkedIn and our website. We are grateful for your positive feedback and engagement, which has contributed to a nearly 40% increase in our LinkedIn followers. It is rewarding to see that our content resonates with you, and we value your positive feedback.
Time truly flies when you are having fun and this year is no exception. Christmas is around the corner! Hopefully the remainder of the year will be as exciting as the rest of the year and we look forward to the last few challenges and opportunities before we say goodbye to 2024.

Pumping stations are essential drainage infrastructure components, ensuring wastewater and stormwater are efficiently transported from lower to higher elevations where gravity flow is not possible. This article answers the questions:
Adoptable vs. Private Pump Stations
Adoptable Pump Stations: Owned and maintained by sewerage undertakers, adoptable pump stations adhere strictly to industry regulations, predominantly Sewerage Sector Guidance (SSG). These stations must obtain approval (typically via a S104 application) from the relevant sewerage undertaker before construction can commence, ensuring compliance with rigorous design and construction standards.
Private Pump Stations: Owned and managed by private entities such as developers, private management companies or homeowners, private pump stations must predominantly meet Building Regulations Part H design requirement. The responsibility for operation, maintenance, and troubleshooting rests with the private owner, potentially leading to higher long-term costs and management complexities.
Key Parameters for Pump Station Design
Two critical parameters govern the design of pump stations:
Peak Pump Rate: This is the maximum flow rate a pump station can handle, crucial for meeting peak demand periods. Calculated by estimating average daily flow based on population and development type, this value is then multiplied by a peak factor (typically between 2 to 6) to accommodate daily usage fluctuations. Guidance from British Water’s Flows and Loads document offers estimates for daily flows per person across various development types.
Emergency Storage: This parameter refers to the volume available to contain inflows during pump station failures or maintenance periods. Calculated by multiplying the expected duration of non-operation (typically 24 hours as per Building Regulations Part H) by the inflow rate over that period, it ensures system reliability during emergencies. However, Sewerage Undertakers and local regulations may apply different approaches to determine this volume.
Types of Pump Stations
Private Pump Stations: Offered in a wide range of products tailored to specific applications and capacities, package pump stations stand out for their pre-assembled design, which simplifies installation and reduces on-site construction time and costs. Their compact footprint makes them suitable for confined spaces, while factory testing guarantees reliability and performance. Integrated control systems further enhance operational efficiency and monitoring capabilities.
Adoptable Pump Stations: Defined by the Sewerage Sector Guidance Appendix C, these stations are categorized into several types based on their capacity and application:
SSG Appendix C also specifies minimum distances from habitable buildings to pump station wet wells, which are crucial considerations influencing drainage strategy in terms of available space.
At Civilistix we know that pump stations are frequently used in drainage designs and as such it is important to understand the key parameters and different types of pump stations on offer.

Blue roofs are a sustainable drainage element designed to provide attenuation by temporarily storing rainwater and releasing it slowly. Their design includes features like drainage layers, flow control devices, and storage systems. With the increasing demand for Sustainable Drainage Systems (SuDS) in all types of projects, blue roofs are becoming more common, whether combined with green roofs or as an alternative to below-ground tanks.
When a blue roof is included in the design, input from various consultants is required early in the process:
Incorporating blue roofs into building projects offers a sustainable solution for managing rainwater, promoting better urban water management, and contributing to environmental sustainability. Successful implementation requires early and continuous collaboration among structural engineers, architects, MEP engineers, and civil engineers. By working together, these professionals can ensure that blue roofs are effectively integrated into the overall design, providing both functional and environmental benefits.

Civilistix Consulting Engineers were appointed to prepare a utility assessment to support a planning application for a proposed mixed-use development consisting of a 11-storey building (basement included).
It was proposed that the ground floor would be used for commercial use, consisting of 196m² of internal floor area, and floors above would be for residential use with 33 residential flat units and associated proposed external infrastructure.

The purpose of our utility assessment was to review the presence of all underground utilities operated by local statutory undertakers within the vicinity of the site to determine the effect, if any, the proposed development may have. This included:
As part of the utility statement report, we were tasked with:

One of the key considerations in drainage system design is ensuring that the pipelines remain free of blockages, which can lead to costly maintenance and environmental hazards. The concept of self-cleansing velocity plays a critical role in achieving this goal.
Self-cleansing velocity refers to the minimum flow velocity required within a drainage pipe to prevent the accumulation of sediment and debris. When water flows through a drainage system at or above this velocity, it can effectively transport solids, preventing them from settling and leading to potential blockages. This concept is particularly vital in areas prone to high levels of sedimentation or where the drainage network is extensive and complex.
Importance in Drainage Design
Ensuring that the drainage system maintains self-cleansing velocity is essential for several reasons:
Factors Influencing Self-Cleansing Velocity
Several factors influence the self-cleansing velocity within a drainage system, including:
The primary guideline for determining self-cleansing velocities in private pipe networks in England is BS EN 16933-2 (2017) – Drain and Sewer Systems Outside Buildings – Hydraulic Design.
For adoptable sewerage systems, the Sewerage Sector Guidance (SSG) Appendix C specifies that the minimum self-cleansing velocity should generally be 0.75 m/s for foul sewers and 1.0 m/s for surface water sewers. These recommended velocities are intended to ensure that the drainage system effectively prevents sediment deposition under normal operating conditions.
The relationship between velocity (V), flow rate (Q), and cross-sectional area (A) of a drainage pipe is fundamental in understanding how to achieve and maintain self-cleansing velocity. This relationship is described by the equation:

Where:
This equation demonstrates that the velocity of flow within a pipe is directly proportional to the flow rate and inversely proportional to the cross-sectional area of the pipe.
Conclusion
Self-cleansing velocity is a fundamental concept in drainage design that ensures the long-term efficiency and reliability of drainage systems in the UK. By carefully considering factors such as pipe material, diameter, slope, and sediment type, and understanding the relationship between velocity, flow rate, and area, engineers can design systems that minimize blockages, reduce maintenance costs, and protect the environment. As the demand for more sustainable urban drainage solutions grows, maintaining self-cleansing velocity will remain a critical consideration in the effective management of water resources.

Soakaways are used to infiltrate surface water into the ground.
Typically, soakaways must be able to attenuate surface water with no flooding during the critical 1 in 100 years plus 40% climate change event and half drain within 24 hours to meet current best practice design guidance.
Soil consistency varies considerably across the UK. Therefore, the infiltration rate of the ground needs to be established at the site of the proposed soakaway to establish a suitable design infiltration rate.
The infiltration rate is influenced by soil type, soil structure and moisture content among other factors
In order to establish a suitable design infiltration rate, an infiltration test to BRE 365 should be conducted. Typical requirements of BRE 365 are as follows:
Infiltration Guidelines:
Infiltration Test Procedure:
Once the excavation pit has been dug, it should be quickly filled with water to 75% of its depth.
A record is then kept of the time taken for the water level to reach 25% of the pit depth.
This procedure should be repeated 3 times for each BRE 365 trial pit. The depth of the water should generally be recorded every 10 minutes or every 100mm that the water level drops.
Calculating Infiltration Rate:
As of BRE 365 infiltration methodology, soil infiltration rate can be determined as follows:
Where:
![]()
Vp75-25 : effective storage volume of water in the soakage trial pit between 75% and 25% effective storage depth.
∂s50 : internal surface area of the soakage trial pit up to 50% effective storage depth, including the base area.
tp75-25 the time for the water level to fall from 75% to 25% effective storage depth.
Design of Soakaway
As the infiltration test is repeated 3 times, 3 results for each trial pit are calculated.
The worst (smallest value) infiltration rate is used in the design of the proposed soakaway.
Generally, an infiltration rate of >1 x 10-6 m/s, is considered suitable for infiltration discharge to the ground, allowing for half drain down time within 24 hours.
An overview of general infiltration rates for each type of strata is provided below:

Typical values for the Infiltration Rate of Soils (Courtesy of CIRIA 753; The SUDS Manual)
Summary
An infiltration test to BRE 365 is pivotal in the design of effective soakaways.
Accurate site-specific testing and careful design ensure that soakaways effectively manage surface water, comply with regulations and mitigate the risk of flooding.
Civilistix Services Offered
Planning services: Planning Services Cambridge | Civilistix
Highway services: Highway Engineering Cambridge | Civilistix
Drainage engineering: Drainage Engineering Cambridge | Civilistix
Surveying services: Surveying Services | Civilistix
News & Views

November 12, 2026
Topographical surveys help identify overland flow routes and low points where water may collect. Accurate survey information supports informed drainage design, flood risk assessment and site layout decisions from the outset.

November 6, 2026
Manhole backdrops can offer excavation savings and design flexibility, but introduce hydraulic and maintenance challenges. Their use requires careful consideration of site constraints, adoption requirements and long-term drainage system performance.

October 29, 2026
Drainage easements can influence building positions, drainage strategies and development costs. Identifying these constraints early helps project teams coordinate site layouts, maintain sewer access and avoid unnecessary redesign or diversions.