When planning a development, questions clients often ask are:
“How much will the drainage design cost?”
“What information do you need to prepare the design?”
The answer depends on the nature of the site, the proposed development and the level of information available at the outset. Drainage design is not a standalone exercise; it must be considered alongside the site layout, levels, ground conditions, flood risk, utilities and planning requirements.
Providing clear information early in the process enables us to identify constraints, reduce project risk and develop a drainage strategy that is appropriate for the site. It also helps avoid unnecessary delays during planning, technical approval and detailed design.
The following information is particularly useful when preparing a drainage design or providing an initial fee proposal.
1. Site Location
The site location is one of the most important starting points for any drainage assessment. It helps establish the wider planning and environmental context, including:
2. Planning Drawings or Site Layout
Drainage must be designed in conjunction with the proposed site layout. Buildings, access roads, parking areas, hardstanding and landscaped areas all influence how surface water can be managed.
Early review of the layout helps establish whether there is sufficient space for attenuation, whether permeable paving or other SuDS features can be incorporated, where suitable outfalls may be located, and whether the drainage strategy could conflict with foundations, retaining walls or other structures.
3. Topographical Survey
A topographical survey, or levels survey, provides essential information on how the site currently falls and where water is likely to flow.
This information typically includes existing ground levels, site gradients, drainage features, manholes, buildings, trees, walls and boundaries.
Accurate level information enables the drainage design to work with the natural characteristics of the site where possible. This can improve buildability, reduce unnecessary excavation and support a more efficient drainage solution.
4. Existing Drainage Information
Where drainage infrastructure already exists, it may be possible to incorporate or connect to it, subject to suitability, capacity and the agreement of the relevant approving authority (Section 106 agreement).
Useful information includes existing manhole locations, sewer connections, pipe routes, culverts, ditches and watercourses.
5. Ground Investigation and BRE 365 Infiltration Testing
Ground conditions are a key factor in determining whether infiltration drainage is viable. Ground investigation information can confirm soil permeability, groundwater levels, ground conditions and any constraints associated with foundations or contamination.
BRE 365 infiltration testing is often required to confirm whether soakaways or other infiltration-based SuDS features are suitable for the site. This testing is one of the services we can provide and, where appropriate, it can form an important part of the drainage design process.
It is not unusual for a project to begin before every survey, report or drawing is available. We regularly support clients at different stages of the development process, from early feasibility and concept design through to detailed technical submissions.
The more information that can be provided at the start, the better we can understand the site, identify constraints and advise on the most appropriate drainage approach. This supports a more efficient design process, helps minimise delays and contributes to a smoother route through planning and technical approval.
If you are planning a development and need drainage design advice, please contact our team to discuss your project requirements.
enquiries@civilistix.com
News & Views

November 6, 2026
Manhole backdrops can offer excavation savings and design flexibility, but introduce hydraulic and maintenance challenges. Their use requires careful consideration of site constraints, adoption requirements and long-term drainage system performance.

October 29, 2026
Drainage easements can influence building positions, drainage strategies and development costs. Identifying these constraints early helps project teams coordinate site layouts, maintain sewer access and avoid unnecessary redesign or diversions.

October 23, 2026
Safe pedestrian routes require careful coordination where they cross vehicle accesses. We explore how layout, visibility, vehicle speeds, accessibility and drainage help create safe pedestrian crossings.