S38 and S278 Agreements with Local Highways Authorities

October 9, 2024

When developers undertake construction projects that involve roads and associated drainage infrastructure, they often need to interact with Local Highway Authorities (LHA) to ensure proper integration with public highways and to ensure works are carried out to the correct standard. Two of the most common legal agreements required are Section 38 (S38) and Section 278 (S278) agreements under the Highways Act 1980. These agreements define the relationship between developers and the LHA regarding the adoption, modification, or improvement of highways and associated drainage systems.

What are S38 and S278 agreements?

  • Section 38 (S38) Agreement

A S38 Agreement is made between a developer and a local council to facilitate the adoption of new roads and associated drainage systems constructed as part of a development.

The primary function of a S38 Agreement is to outline the responsibilities for the design, construction and maintenance of roads and drainage systems, with the end goal of having these features adopted by the LHA. Once adopted, the highway becomes part of the public road network, meaning the council assumes responsibility for its perpetual maintenance, including routine works such as resurfacing, street lighting, and stormwater management.

  • Section 278 (S278) Agreement

A S278 Agreement allows developers to carry out alterations or improvements within the existing public highway. S278 agreements come into play when a development impacts existing highways, for instance new access roads or junctions, widening or realigning roads, and traffic calming measures like speed humps or signal-controlled junctions.

Requirements for entering into a S38 or S278 Agreement.

When entering into a S38 or S278 agreement, the LHA usually require the following:

  • Detailed Design Plans: Developers must provide detailed designs for changes to road layout, traffic control measures, drainage modifications as well as new roads, pavements, footpaths, street lighting, drainage, and any other associated infrastructure.
  • Highway and Drainage Impact Assessment: Developers need to assess how their development will impact the existing road network and drainage infrastructure, particularly in terms of increased traffic flow, surface water runoff, and potential flooding issues.
  • Construction Standards: Roads and drainage systems must be constructed to specific technical standards set by the council, often following national guidance such as the “Design Manual for Roads and Bridges (DMRB)”, Manual for Streets (MfS) or otherwise LHA in-house design standards.
  • A Road Safety Audit is often required to assess the safety implications of proposed changes to the highway. This audit is conducted in several stages (usually at planning, detailed design stage and post construction) and examines the potential risks the new or altered roads may pose to drivers, pedestrians and other road users. Recommendations are made to improve safety and minimize accidents, and implementing these is often mandatory before the council grants final approval.
  • Traffic Management Plan: For any work that impacts existing roads, councils require a traffic management plan to minimize disruption during construction, ensuring that the safety of road users and pedestrians are maintained.
  • Financial Bond/Security: Councils typically require a financial security or bond from the developer to ensure that funds are available to complete the construction of the highways and drainage systems should the developer fail to meet their obligations.
  • Inspection and Certification: Councils will inspect the work periodically across the construction phase, to ensure that it complies with the technically approved design. Once the road and drainage system has been constructed to the technically agreed design drawings, the council will issue a completion certificate.
  • Maintenance Period: Once the works are completed, a maintenance period (typically 12 months) may follow where the developer remains responsible for any defects. Once the period ends and the works are certified, the responsibility for the road and drainage system can be formally adopted by the council.

Conclusion

Both S38 and S278 agreements are essential legal mechanisms to ensure that roads and drainage systems within new developments meet national and Local Highway Authority standards. A S38 agreement pertains to new roads intended for adoption by the council, a S278 agreement focuses on improvements or modifications to existing roads. Councils require detailed designs, strict construction standards and effective drainage systems to reduce flood risks.

At Civilistix, we support our clients in providing the necessary technical information to local highway authorities and assist them in securing approval for these agreements, ensuring smooth project progression.

 

Civilistix Services:

Highway Engineering Cambridge | Civilistix

Adoptable (S278/S38) Highway Design | Civilistix

News & Views

Latest Updates

How Topographical Surveys Inform Drainage Design

November 12, 2026

How Topographical Surveys Inform Drainage Design

Topographical surveys help identify overland flow routes and low points where water may collect. Accurate survey information supports informed drainage design, flood risk assessment and site layout decisions from the outset.

Manhole Backdrops: The Pros and Cons

November 6, 2026

Manhole Backdrops: The Pros and Cons

Manhole backdrops can offer excavation savings and design flexibility, but introduce hydraulic and maintenance challenges. Their use requires careful consideration of site constraints, adoption requirements and long-term drainage system performance.

Why Drainage Easements Matter to Site Layout and Detailed Design

October 29, 2026

Why Drainage Easements Matter to Site Layout and Detailed Design

Drainage easements can influence building positions, drainage strategies and development costs. Identifying these constraints early helps project teams coordinate site layouts, maintain sewer access and avoid unnecessary redesign or diversions.