October 9, 2024

When developers undertake construction projects that involve roads and associated drainage infrastructure, they often need to interact with Local Highway Authorities (LHA) to ensure proper integration with public highways and to ensure works are carried out to the correct standard. Two of the most common legal agreements required are Section 38 (S38) and Section 278 (S278) agreements under the Highways Act 1980. These agreements define the relationship between developers and the LHA regarding the adoption, modification, or improvement of highways and associated drainage systems.
What are S38 and S278 agreements?
A S38 Agreement is made between a developer and a local council to facilitate the adoption of new roads and associated drainage systems constructed as part of a development.
The primary function of a S38 Agreement is to outline the responsibilities for the design, construction and maintenance of roads and drainage systems, with the end goal of having these features adopted by the LHA. Once adopted, the highway becomes part of the public road network, meaning the council assumes responsibility for its perpetual maintenance, including routine works such as resurfacing, street lighting, and stormwater management.
A S278 Agreement allows developers to carry out alterations or improvements within the existing public highway. S278 agreements come into play when a development impacts existing highways, for instance new access roads or junctions, widening or realigning roads, and traffic calming measures like speed humps or signal-controlled junctions.
Requirements for entering into a S38 or S278 Agreement.
When entering into a S38 or S278 agreement, the LHA usually require the following:
Conclusion
Both S38 and S278 agreements are essential legal mechanisms to ensure that roads and drainage systems within new developments meet national and Local Highway Authority standards. A S38 agreement pertains to new roads intended for adoption by the council, a S278 agreement focuses on improvements or modifications to existing roads. Councils require detailed designs, strict construction standards and effective drainage systems to reduce flood risks.
At Civilistix, we support our clients in providing the necessary technical information to local highway authorities and assist them in securing approval for these agreements, ensuring smooth project progression.
Civilistix Services:
News & Views

November 12, 2026
Topographical surveys help identify overland flow routes and low points where water may collect. Accurate survey information supports informed drainage design, flood risk assessment and site layout decisions from the outset.

November 6, 2026
Manhole backdrops can offer excavation savings and design flexibility, but introduce hydraulic and maintenance challenges. Their use requires careful consideration of site constraints, adoption requirements and long-term drainage system performance.

October 29, 2026
Drainage easements can influence building positions, drainage strategies and development costs. Identifying these constraints early helps project teams coordinate site layouts, maintain sewer access and avoid unnecessary redesign or diversions.