Private Drainage Detailed Design and External Works Detailed Design and S106 sewer connection agreement
Civilistix Consulting Engineers were appointed to prepare a detailed drainage and external hardstanding engineering package for the erection of a two-storey rear extension to an existing multi occupancy house. This included a lower ground floor to accommodate 8 additional rooms and a new boundary wall, gates, refuse and recycle storage area, the removal of a skylight and the creation of a new lightwell and screening.
Our fully coordinated surface water drainage solution utilised a gravity drained surface water system discharging proposed hardstanding runoff, at a controlled rate of 2.0l/s, to a public surface water sewer.
An infiltration test was conducted during planning stage by others and indicated that infiltration of the proposed surface water runoff would be feasible, however due to a 5m infiltration easement required between the soakaway and the development extent, this was not achievable. The proposed solution was that the surface water runoff was tanked via a SuDS attenuation tank and discharged at a controlled rate to the public surface water sewer. It was proposed to fully attenuate runoff flows during the 100year + 40% critical storm event. This was agreed with the local authority.
Our fully coordinated foul water drainage solution utilised a gravity drained foul water system discharging effluent to a public foul water sewer. Due to depth constraints of the public foul water sewer in relation to lower ground floor level, the lower ground floor required pumping.
Our fully coordinated external works package included level design, kerb layout design and full depth construction details for proposed hardstanding. We were tasked to provide finished ground levels and set proposed Finished Floor Levels (FFL’s) for the proposed developments within the private boundary extents.