CASE STUDY

Byron Street, Langdon Park, London

Private Drainage Detailed Design (RIBA 4/5) and External Hardstanding Detailed Design (RIBA 4/5)

Service offered

  • Private Drainage Detailed Design (RIBA 4/5)
  • External Hardstanding Detailed Design (RIBA 4/5)

The brief

Civilistix Consulting Engineers were appointed to prepare a detailed drainage and external hardstanding package to help deliver a 3-6 storey building providing 67 residential units, along with pedestrian courtyard areas and other associated external hardstanding areas.

What we did

The existing site was classified as brownfield comprising of a single storey boarded and dilapidated building with an impervious area of approximately 2030m2.

Our fully coordinated detailed drainage solution utilised permeable surfaces with type 3 sub-base together with a lined geo-cellular storage tank to store all runoff generated from the proposed site. The permeable sub-base depth, lined tank and associated pipe network were sized to accommodate the 100 year + 40% critical storm event. A controlled connection was proposed to discharge all surface water runoff at 2.00 l/s from site as well as the foul water drainage generated from the proposed development to an existing Thames Water combined water sewer.

Our fully coordinated external works package included level design, kerb layout design and full depth construction details for the proposed hardstanding. We were tasked to provide finished ground levels and set proposed Finished Floor Levels (FFL’s) for the proposed development within the private boundary extents.

This project proved challenging in that we had to coordinate our proposed drainage network with the proposed services and upgrade the UKPN sub-station to accommodate our designs.  We also had to coordinate our proposed drainage infrastructure to allow for a proposed crane base.

 