Linkedin
CASE STUDY

Old Ford Wastewater Recycling Plant Retrofit, Olympic Park, London

Flood Risk Assessment and Drainage Strategy for Planning

Services offered

  • Flood Risk Assessment and Drainage Strategy for Planning

The brief

Civilistix Consulting Engineers were appointed to prepare a Flood Risk Assessment (FRA) and Drainage Strategy to support a planning application to repurpose a disused water treatment plant at Old Ford Island on the western edge of the Queen Elizabeth Olympic Park. The purpose of this project was to provide a new home for the teams responsible for the security, management, and landscape maintenance of the park.

What we did

The site is located within Flood Zone 3 and a detailed review of the flood extent and levels was required to determine how to safely implement the development proposals, and to identify opportunities for the use of Sustainable Drainage (SuDS) techniques. Upon consultation with the Environment Agency, Civilistix identified the areas which were at high risk of flooding. A site wide strategy was prepared to ensure the new buildings would not be at risk of flooding and that surface water discharge would not be displaced resulting in issues elsewhere.

Civilistix followed the surface water run-off hierarchy as per Part H of the Building Regulations Act, to design the surface water Drainage Strategy. The Drainage Strategy included 2 different options for surface water discharge due to the limited opportunities to conduct site investigations:

  1. Infiltration disposal was the primary consideration given the ballast bedrock identified. However, based on a review of the recorded drawings and borehole logs, it was noted that there might be a risk of contamination of the ground water and consequently an alternative disposal method should be reviewed.
  2. A pumped controlled discharge was considered within the strategy should infiltration not be feasible once the final ground investigation works are completed.

It was proposed that the full external hardstanding area would utilise tanked permeable paving construction, which would accommodate voided Type 3 sub-base material, and an attenuation basin for the discharge of the roofs runoff. This would allow for the treatment of runoff and sufficient attenuation storage volume so that the control water of 2.0 l/s would be ensured. Further to the above measures, it was proposed that green and blue roofs be incorporated in the roof areas, thus providing interception storage, slowing down runoff and providing treatment.

All Foul Water would be gravity fed to an existing Thames Water Foul Water Sewer.

Civilistix worked in close collaboration with other design teams to deliver a fully coordinated proposed external works and drainage design solution for the client, which was granted planning permission.

 

Civilistix Services:

Planning Services Cambridge | Civilistix

Flood Risk Assessments (FRA’s) | Civilistix