Drainage Strategy and Civil Engineering Detailed Design
Civilistix was responsible for preparing the Drainage Strategy and the Civil Engineering Detailed Design for the construction of a new five-dwelling development at Prestwick, Buntingford.
As part of the planning stage, Civilistix conducted percolation testing, which revealed that the local geological conditions were unsuitable for the use of infiltration devices.
Following the Drainage Hierarchy, the next option explored was connecting to a watercourse. Two ditches were identified along the site, and it was concluded that a controlled discharge to the watercourse south of the site, was the most viable solution.
The existing site levels were steep, with gradients of up to 1 in 15. To address this, a complex hydraulic model was developed to optimize the attenuation tank depths while ensuring no flooding occurred within the site. Additionally, the model maintained suitable road gradients in compliance with accessibility requirements.
Lined permeable paving was proposed to enhance SuDS (Sustainable Drainage Systems), with carrier pipe levels designed to enable attenuation within the gravel sub-base.
The planning approval process required liaison with the LLFA (Lead Local Flood Authority) to discharge conditions related to flood risk. Civilistix also designed a culvert for one of the ditches, facilitating the construction of the access road while ensuring there was no increased risk of flooding either onsite or elsewhere.
Civilistix Services:
Planning Services Cambridge | Civilistix



