Adoptable Highway (S278) Detailed Design & Swept Path Analysis
Civilistix Consulting Engineers were appointed to prepare an adoptable highway (S278) detailed design, for the creation of 2no. proposed bell-mouth vehicular accesses connecting with Bushmead Road associated with a solar farm project.
The western proposed junction was existing and required upgrading to suit development proposals. The eastern proposed junction was new and required access to land north of Bushmead Road.
Civilistix prepared full Highway Design Packages in accordance with Bedford Borough Council design standards to secure technical approval for the proposed works.
Proposed bell-mouth geometry was created and put forward for adoption by Bedford Borough Council for safe ingress and egress of articulated vehicles expected to access the proposed site. Swept Path Analysis drawings were created to inform the proposed bell-mouth geometry.
Proposed junction locations were reviewed to ensure sufficient visibility splay were achieved along Bushmead Road. Visibility splays were informed by actual speed survey data collected along Bushmead Road.
The western proposed junction required culverting of an existing watercourse to access the proposed site. Proposed longitudinal sections and cross sections of the proposed culvert works were created to agree the proposed works with Bedford Borough Council.
The Section 278 (S278) highway design received technical approval from the highway authority.
Civilistix Services:
Highway Engineering Cambridge | Civilistix



