Combined Flood Risk Assessment & Drainage Strategy Drainage & External Hardstanding Detailed Design Packages Environment Agency Environmental Permit Application for the Discharge of Treated Effluent.
Civilistix was responsible for preparing a Flood Risk Assessment and Drainage Strategy to support the planning application, together with the detailed design packages for the Drainage and External Hardstanding works. The development comprised the creation of a new residential dwelling and associated external hardstanding areas.
The surface water drainage strategy incorporated a piped network conveying runoff to a geocellular attenuation tank, before a controlled discharge to an existing ditch. The proposed system provided sufficient attenuation for the 1-in-100-year storm event, including a 40% allowance for climate change.
Due to the absence of a public foul sewer in the vicinity of the site, the foul water drainage strategy proposed discharge to the existing ditch following appropriate treatment via a sewage treatment plant.
As the receiving ditch did not have continuous flow throughout the year, an Environmental Permit from the Environment Agency (EA) was required for the discharge of treated foul water effluent. Civilistix prepared and submitted the permit application on behalf of the client and successfully secured approval from the EA.
Civilistix obtained all necessary approvals while working closely with the client to satisfy regulatory requirements and meet project deadlines. Our expertise in drainage design, SuDS implementation, and flood risk assessment, contributed to the successful delivery of this project.