The brief

Civilistix Consulting Engineers were appointed to prepare a Combined Flood Risk Assessment & Drainage Strategy Report to support a planning application for the proposed development of a  workshop building, access road, car parking, and associated external storage yard.

What we did

The assessment was informed by BRE365 infiltration testing. High groundwater levels were encountered which limited the feasibility of infiltration-based drainage solutions. As a result, a controlled surface water discharge was proposed to an existing ditch along Spout Lane, restricting runoff at 2.0l/s for all storm events including the critical 1 in 100-year storm event plus 40% climate change allowance.

A sustainable drainage solution (SuDS) was proposed to manage runoff  and provide attenuation. This included permeable paving, filter strips and a bypass oil separator.

A lined attenuation tank was proposed to provide additional storage and to balance surface water flows for the development.

It was proposed that all foul water would be discharged via gravity to an existing Thames Water sewer. The proposed connection and discharge rates were agreed with Thames Water through a Section 106 application.

 